Fabrication and Installation of Crane Grillage

client
Olympic Artemis AS
location
Rotterdam, the Netherlands
services / products
fabrication

Earlier this year our fabrication department completed a crane grillage for  the Olympic Artemis.

The scope of work consisted of making the workshop drawings, purchase of materials, fabrication, NDT, installation and testing of the grillage.

On this grillage an Effer crane, complete with pedestal, has been placed in position. After positioning the crane on board, a load test has been carried out to a proof load of approx 10.0 Ton.

 

  • Length: 6.0 meter
  • Width: 3.0 meter
  • Safe Working Load: 6.23 Ton
  • Proof load: 10.00 Ton

Qualifications

At Franklin Offshore Europe we implemented management systems to assure excellence in every aspect of the services to our customers. This means certification in quality of our products and services, as well as environment, health & safety.

DNV-GL ISO 3834-2
(Welding)
DNV-GL ISO 14001:2015
(Environment)
DNV-GL OHSAS 18001:2007
(Health & Safety)

We work with the world's best classification societies

For other class societies, please contact us